Friday 27 November 2026: Two days down…

Image from Pixabay

The lie-in we hoped for on Wednesday actually happened on Thursday. The bathroom fitters had a good day and said they’d be back at around 9:30am again the following day. We weren’t expecting any deliveries, nor the skip getting collected. So we caught up on a bit of sleep. The dog still had us up early and we still had a lot to do before the water was turned off again, but those few minutes seemed to make all the difference.

The plumber arrived at 9:10am, so he was 20 minutes early. But that was fine. We were up and about and just making sure we had a full kettle to last as long as the water was off again. He started straight away and was almost finished by the time his partner arrived. They’d been out for their work’s Christmas do the night before (all 2 of them, plus their wives) and were in fine spirits.

While they were still finishing the first fix, the plasterers arrived, which the dog thought was ace. All these people!

The plumbers moved out and the plasterers moved in. They were a lot quieter and I was able to spend longer in my office, which has an adjoining wall with the bathroom.

I say ‘bath’ room, but it’s really a shower room. There was a bath in there when the house was first built but the previous owner had replaced it with a shower that had a tray the length of a short bath. It was fine, and it probably suited him, but the shower screen was placed so you couldn’t reach the taps without getting into the shower. Which means I couldn’t *just* wash my hair, I had to have a full shower, and we couldn’t bath the dog without one of us getting in with him!

After a great deal of thought, and with a heavy heart, we decided to keep the shower and continue without a bath. We’re not getting any younger, although I do much prefer a bath, but the room is quite small and I wanted a better illusion of space. So we’re replacing the room-length shower with a corner unit, the biggest the plumber could find and relocating the wash hand basin and the toilet. A new heated towel rail will go where the basin used to be.

By the time the plumbers had finished their first fix, all the pipework was in, all the old tiles were down, all the old floor tiles were gone. The plasterers were then able to go in and prep all the walls and the ceiling, and they were hopeful they’d be done by the end of the day. If that’s the case, we’ve got an unexpected day off today – and another lie in!

The first job I did was post yesterday’s blog post. I’d written it the day before but not posted it, for some reason. So I did that as soon as I could. Once it was out of the way, I started today’s blog post.

The poet went out and protected the tiles that arrived on Wednesday, which were in boxes in between my car and the campervan on the drive. We thought it was going to be cold but dry this week, in which case they would have been fine. But then I saw a wide band of rain approaching from the west that will cover the entire length of the British Isles for the whole of today. So they had to be covered. Fortunately we haven’t had a frost since the tiles were delivered, but I’m hoping they need to be out there a bit longer than they will be for the frost to damage them…

Back to the client edit, which took up the rest of the day. Before finishing for the day, though, the plasterers left, saying they would be back this morning after all – or one of them would – as they didn’t have the correct sized timber on the van to finish all the boxing in. We’re all hopeful that he’ll get it done in a couple of hours, and he won’t be here until 9am-ish, so we still won’t have to get up too early.

The tiler is here tomorrow, the plumbers are back on Monday, and then the electrician will be here to install a new extractor fan, a new ceiling light, and 2 new pull chord switches. As the skip is still on the drive, the poet or all of us will go out in his car today to get the week’s shopping, 3 week’s-worth of meat from the butcher (after that we’ll be picking up our regular Christmas hamper), some bird food, and a kitchens-and-bathrooms paint. More on how this goes next week!

Our road is closed tomorrow for surface dressing, but the tiler is here as well. Apparently, he’s a bit of an early starter, usually getting to work at around 7:30am. If so, he’ll get through okay as the road doesn’t close until 8am. If he leaves before 5pm, though, he may have a few minutes’ wait to get out again.

If we get the paint today, the poet will paint the bathroom ceiling when the tiler has finished on Sunday. The plasterer says it should be okay to paint 2 – 3 days after he’s finished, which will be Sunday afternoon. Otherwise, we’ll be tied to the house again.

Whatever you’re up to at the weekend, I hope it’s a good one and I’ll see you on the other side.


Leave a Reply

Your email address will not be published. Required fields are marked *